|
|
CULPEPER DISTRICT: Jan. 29-Feb. 2, 2024
CULPEPER — The following highway work is scheduled, weather permitting, in the Culpeper District during the next week. Traffic movements may be restricted and speed limits reduced in work zones.(NEW) or (UPDATE) indicate revisions since last week’s report.
Culpeper District traffic information is also available on Twitter at @VaDOTCulp and on VDOT’s website at http://www.virginiadot.org/travel/travel_alerts/culpeper/default.asp.
Albemarle County
(NEW) Debris Pick-up – Expect mobile, alternating lane closures, 10 a.m. to 2 p.m. in the following areas:
- Route 53 (Thomas Jefferson Parkway), between Route 729 (Milton Road) and the Fluvanna County line in the eastbound and westbound lanes, Monday.
- Route 231 (Gordonsville Road), between Route 615 (Lindsay Road) and Route 860 (Kloeckner Road) in the northbound and southbound lanes, Thursday.
(NEW) Utility work under VDOT permit – Expect lane and shoulder closures, 10 a.m. to 2 p.m. in the following areas:
- Interstate 64, right lane and right shoulder closed between mile marker 117 and mile marker 119 in the eastbound lanes, from 10 p.m. Monday to 6 a.m. Tuesday.
- U.S. 29 (Monacan Trail), intermittent slow roll closures with flaggers between Route 692 (Plank Road) and Route 708 (Red Hill Road) in the northbound and southbound lanes, 9 a.m. to 3 p.m. Monday through Saturday.
- U.S. 29 (Monacan Trail), intermittent slow roll closures with flaggers between Route 633 (Cove Garden Road) and Route 760 (Red Hill School Road) in the northbound and southbound lanes, Sunday, 9 a.m. to 3 p.m.
U.S. 250 (Rockfish Gap Turnpike) – Road widening project. Expect lane closures between Birdsall Lane and Route 750 (Old Turnpike Road). The westbound lanes will remain reduced from two lanes to one and the eastbound lane shift will remain in place. This is a long-term closure for the duration of the project. Expected completion date, April 2024.
Route 20 (Scottsville Road) – Bridge superstructure repairs/replacement. Expect temporary traffic signal with new traffic pattern at Route 708 (Red Hill Road). Route 708 is narrowed to one lane for construction on the bridge over the North Fork Hardware River in the southbound lanes. Project completion date, Dec. 2024.
Route 641 (Frays Mill Road) – Other bridge work. Road closed at Route 743 (Advance Mills Road) for replacement of bridge over Marsh Run. Drivers on U.S. 29 (Seminole Trail) who need to access Route 743 north and west of the closure should use Route 607 (Cedar Grove Road). Expected completion date, Dec. 5, 2024.
(NEW) Route 1417 (Woodbrook Drive) – Storm drain work. Expect alternating lane closures between U.S. 29 North (Seminole Trail) and Route 1403 (Berkmar Drive) in the eastbound and westbound lanes Monday through Wednesday, 8 a.m. to 5 p.m.
Culpeper County
(NEW) Bridge repairs – Expect alternating lane closures daily, 7 a.m. to 5 p.m. in the following areas:
- Route 649 (Cedar Mountain Drive), between Route 692 (Old Orange Road) and Route 652 (Mitchell Road) in the northbound and southbound lanes.
- Route 663 (Stevensburg Road), between Route 666 (Greens Corner Road) and Route 600 (York Road) in the northbound and southbound lanes.
Route 669 (Carrico Mills Road) – Utility work under VDOT permit. Expect occasional shoulder and lane closures between Route 3 (Germanna Highway) and Route 672 (Stones Mill Road) in the northbound and southbound lanes, daily, 9 a.m. to 3 p.m.
Fauquier County
(NEW) Utility work under VDOT permit – Expect lane and shoulder closures in the following areas:
- U.S. 29 (James Madison Highway), right lane closure between Route 744 (Lovers Lane) and Route 800 (Old Culpeper Road) in the southbound lanes, Tuesday, 9 a.m. to 3 p.m.
- Route 690 (Bear Wallow Road), alternating lane closures between Filly Lane and the Warrenton Town line in the northbound and southbound lanes, daily, 9 a.m. to 3 p.m.
- Route 1175 (Millfield Drive), road closed between Route 1176 (Horn Lane) and the cul-de-sac at the end of Millfield Drive, Monday through Friday.
(NEW) Route 656 (Remington Road) – Bridge repairs. Expect alternating lane closures with flaggers between North Franklin Street and the Remington Town line in the northbound and southbound lanes, daily, 7 a.m. to 5 p.m.
Greene County
(NEW) U.S. 33 (Spotswood Trail) – Tree trimming. Expect mobile, alternating lane closures between Route 625 (Goose Pond Road) and the Rockingham County line in the eastbound and westbound lanes, Monday through Friday, 8 a.m. to 2:30 p.m.
Louisa County
Construction of new roundabout – Expect alternating lane closures daily, 7 a.m. to 6 p.m. in the following areas. Project anticipated completion date, Jan. 31, 2025.
- U.S. 522 (Zachary Taylor Highway) between Route 623 (Chopping Road) 0.3 miles north of Route 208 (New Bridge Road) in the northbound and southbound lanes.
- Route 208 (New Bridge Road) between U.S. 522 (Zachary Taylor Highway) and Alma Gaynelle Drive in the eastbound and westbound lanes.
(NEW) Utility work under VDOT permit – Expect lane and shoulder closures in the following areas:
- Route 231 (Gordonsville Road), alternating lane closures with flaggers between Linden Lane Farm and Rock Rockview Lane in the northbound and southbound lanes, daily through Wednesday, 9 a.m. to 3:30 p.m.
- Route 613 (Oakland Road), east lane and right shoulder closure between Route 669 (Ellisville Drive) and Route 693 (Kents Mill Road) in the eastbound lanes, Wednesday, 9 a.m. to 3:30 p.m.
- Route 652 (Kentucky Spring Road), right shoulder closure between Route 208 (New Bridge Road) and Route 614 (Carrs Bridge Road) in the northbound lanes, daily, 9 a.m. to 3 p.m.
- Route 652 (Kentucky Spring Road), right shoulder closure between Route 652 (Pine Point Place) and Route 700 (Haley Drive) in the southbound lanes, daily, 8 a.m. to 4:30 p.m.
- Route 652 (Kentucky Springs Road), left lane and left shoulder closures between Route 208 (New Bridge Road) and Route 1035 (Pine Point Place) in the southbound lanes, daily, through Wednesday, 9 a.m. to 3 p.m.
- Route 669 (Ellisville Drive), left shoulder closed between Route 613 (Goldmine Road) and Route 613 (Oakland Road) in the southbound lanes, Tuesday, 9 a.m. to 3:30 p.m.
- Route 700 (Haley Drive), right shoulder closed between Route 652 (Kentucky Springs Road) and the North Anna Nuclear Information Center in the northbound lanes, daily through Wednesday, 8 a.m. to 4:30 p.m.
(NEW) Interstate 64 – Ditch cleaning. Expect right shoulder closures between mile marker 131 and mile marker 147 in the eastbound and westbound lanes, daily, 8 a.m. to 4 p.m.
Madison County
(NEW) U.S. 29 (North Seminole Trail) – Pipe repairs/installation. Expect left lane closures between Route 631 Kirtley Road) and Route 612 (James City Road) in the northbound lanes, Monday, 9 a.m. to 4 p.m.
(NEW) U.S. 29 (South Seminole Trail) – Bridge repairs. Expect alternating lane closures between Route 621 (Seville Road) and Route 609 (Fredericksburg Road) in the southbound lanes, daily, beginning Thursday, 7 a.m. to 5 p.m.
Orange County
Route 20 (Constitution Highway) – Pole installation. Expect alternating lane closures with flaggers between Route 629 (Lahore Road) and Route 625 (Porter Road) in the northbound and southbound lanes, daily, 9 a.m. to 3 p.m.
Rappahannock County
U.S. 211 (Lee Highway) – Pipe repairs/installation. Expect alternating lane closures between Route 640 (Battle Mountain Road) and Route 611 (Seven Ponds Road) in the eastbound and westbound lanes, daily, beginning Friday, 8 a.m. to 5 p.m.
(NEW) Route 729 (Richmond Road) – Bridge approach repairs. Expect flagging operation at Route 676 (Gore Road) in the northbound lanes, daily, starting Thursday, 7 a.m. to 5 p.m.
Road conditions and other real-time travel information can be found on the 511 Virginia website,
the free VDOT 511 mobile app or by calling 511 from any phone in Virginia. VDOT updates are also on the Culpeper District Facebook page and the district’s Twitter account, @VaDOTCulp.
LYNCHBURG DISTRICT
TRAFFIC ALERT
January 29–February 4, 2024
LYNCHBURG, Va. – Highway work requiring road/lane/structure closures is planned;
however, work may be delayed/canceled due to weather or other issues. Items in
italics contain new/updated information. For up-to-date information, call 511 or visit
www.511Virginia.org.
District-wide activities:
Crews will perform various activities throughout the district to include, but are not limited to
bridge & guardrail maintenance, brush/tree/limb cutting, pothole/surface/shoulder work,
surface treatment/paving operations, work orders, mowing, boom axing, drainage repairs/
work and roadside cleanup.
Work at specific locations:
Amherst County:
Please note district-wide activities above.
Appomattox County:
Route 131 (Old Courthouse Rd.) from Route 460 BUS (Confederate Blvd.) to Route 460
Bypass (Richmond Highway) – Route 131 Reconstruction. Traffic shift was put in place
on Wednesday, December 13, 2023. Lane closures expected. Use caution. Estimated
completion January, 2025.
Please note district-wide activities above.
Bedford County:
Please note district-wide activities above.
Buckingham County:
Please note district-wide activities above.
Campbell County:
Please note district-wide activities above.Charlotte County:
Route 15 (Farmville Highway) at Route 15/360 BUS (Four Locust Highway) – Roundabout
project. Change in traffic pattern now in place allowing two-way movement along Route
15/360 BUS (Four Locust Highway) and a stop condition for Rte. 15 (Farmville Highway)
southbound traffic. The on-ramps from Route 15 to the Route 15/360 (Kings Highway) and
the off-ramp from Route 15/360 (Kings Highway) to Route 15 are closed to traffic.
Message boards and detour signage will alert motorists to the change and direct traffic
along the detour. Estimated overall project completion October 2024.
Route 701 (Thorntons Mill Road) – Debris removal. Route 701 (Thorntons Mill Road) is
closed from Route 691 (Tower Road) to Route 615 (Rolling Hill Road) due to debris
removal. A detour with signs is in place. Estimated completion February 16, 2024.
Please note district-wide activities above.
Cumberland County:
Please note district-wide activities above.
Halifax County:
Route 501 (L P Bailey Memorial Highway) at Route 628 (Chesnut Road) – Intersection
improvement project. Shoulder and lane closures expected beginning February 5th. Use
caution. Estimated completion December 2024.
Please note district-wide activities above.
Lynchburg:
Please note district-wide activities above.
Nelson County:
Route 60 over James River – Bridge Deck replacement. Lane closures and changes in
traffic patterns in effect. Traffic is utilizing the other side of the bridge to cross. Est. comp.
end of July 2024.
Please note district-wide activities above.
Pittsylvania County:
Please note district-wide activities above.
Prince Edward County:
Route 665 (Worsham Road – Bridge Replacement. Route 665 (Worsham Road) will be
closed to through traffic from Route 15 (Farmville Road) to the intersection of Route 630
(Redd Shop Road) from 1/29/2024 – 5/31/2024. A detour with signs will be in effect, using
Route 15 to Route 628 (Granite Falls Blvd.) to Route 630 (Oak Ridge Road) back to
Route 665.
Please note district-wide activities above.