VDOT : Weekly Traffic Alerts & Road Maintenance For Week Of June 3rd

0
492

 

 

STAUNTON DISTRICT TRAFFIC ALERT

FOR JUNE 3 – 7, 2024

Highway Work Zones in the VDOT Staunton District

STAUNTON – The following is a list of highway work that may affect traffic in the Staunton transportation district during the coming weeks. The Staunton District consists of 11 counties from the Alleghany Highlands to the northern Shenandoah Valley: Alleghany, Bath, Rockbridge, Highland, Augusta, Rockingham, Page, Shenandoah, Frederick, Clarke and Warren.

Scheduled work is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.

*NEW* or *UPDATE* indicates a new or revised entry since last week’s report.

ALLEGHANY COUNTY

INTERSTATE 64

*NEW* Mile marker 38 to 13, westbound – Single lane closures for paving operations at several locations, 7 a.m. to 8 p.m. June 3 – June 21.

PRIMARY ROADS

*UPDATE* Various roads – Flagger traffic control for tree and debris removal, drainage work, pothole patching, brush cutting, ditching and shoulder repairs. Mobile traffic control for tractor mowing. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS

*NEW* Various roads – Mobile flagging operation for pavement repairs on parts of Route 600/661 (Midland Trail), Route 683 (Callaghan Circle), Route 711 (Houston Circle), Route 719 (Bellegray Lane) and Route 9881 (Callaghan Elementary School access road), 7 a.m. to 7 p.m. June 3 – June 14.

*UPDATE* Various roads – Flagger traffic control for ditch work, shoulder repairs, pothole repairs, pipe replacement and brush cutting. Mobile traffic control for tractor mowing. Weekdays from 7:30 a.m. to 3 p.m.

BATH COUNTY

PRIMARY ROADS

*NEW* Route 39 (Mountain Valley Road) – Flagger and pilot truck traffic control between Route 600 (Bolars Draft Road) and Back Creek Mountain Road for paving operations, 5:30 a.m. to 6:30 p.m. weekdays June 3 – July 5.

Route 220 (Sam Snead Highway) – Flagger and pilot truck traffic control between Route 622 (Robinson Lane) and Route 623 (Poor Farm Road) for paving operations, 5:30 a.m. to 6:30 p.m. weekdays through Friday.

Various roads – Flagger traffic control for shoulder repairs and pipe cleaning, 7:30 a.m. to 3 p.m. on weekdays.

SECONDARY ROADS

Various roads – Flagger traffic control for brush cutting and pipe cleaning, 7:30 a.m. to 3 p.m. on weekdays.

ROCKBRIDGE COUNTY

INTERSTATE 64

No lane closures reported.

INTERSTATE 81

*NEW* Mile marker 174 to 176, northbound – Right shoulder closures for shoulder repairs, 7 a.m. to 5 p.m. Monday through Thursday.

Mile marker 175 to 195, northbound – Overnight single lane closures for paving operations, 8 p.m. to 7 a.m. through Thursday night.

*NEW* Exit 195, northbound – Right shoulder closures for shoulder repairs, 7 a.m. to 5 p.m. Wednesday and Thursday.

*NEW* Exit 205, northbound and southbound – Right shoulder closures along off-ramps for sign work, 8 a.m. to 5 p.m. Monday through Friday.

PRIMARY ROADS

Various roads – Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting. Mobile lane closures for mowing, 7:30 to 3 p.m. on weekdays.

SECONDARY ROADS

*NEW* Route 606 (Raphine Road) – Shoulder closures near Augusta County line for sign work, 8 a.m. to 5 p.m. Monday through Friday.

Various roads – Flagger traffic control for grading, pipe replacement, ditch work, tree removal, pavement patching, shoulder repairs and brush cutting. Mobile lane closures for mowing, 7:30 a.m. to 3 p.m. on weekdays.

HIGHLAND COUNTY

PRIMARY ROADS

Various roads – Flagger traffic control for pothole patching, brush cutting and shoulder repairs, 7:30 a.m. to 3 p.m. on weekdays.

SECONDARY ROADS

Various roads – Flagger traffic control for brush cutting, pipe cleaning, tree removal, adding stone to unpaved roads and ditch work, 7:30 a.m. to 3 p.m. on weekdays.

AUGUSTA COUNTY

INTERSTATE 64

Mile marker 87 to 100, eastbound – Mowing operations through 6 a.m. Saturday (June 8). Right shoulder closures during daytime, left shoulder closures at night.

*NEW* Mile Marker 94 to 93, westbound – Right shoulder closures for shoulder repairs, 7 a.m. to 5:30 p.m. Wednesday and Thursday.

*UPDATE* Mile marker 95 to 98, eastbound and westbound – Overnight single lane and shoulder closures for sign installation work, 7 p.m. to 5 a.m. Monday through Wednesday nights.

INTERSTATE 81

*UPDATE* Mile marker 206 to 236, northbound and southbound – Overnight single lane closures for paving operations, 8 p.m. to 7 a.m. nights through June 20.

Mile marker 214 to 210, southbound – Alternating lane closures for milling and paving operations, 8 p.m. to 7 a.m. nights through July 25. Exit 213 traffic will be detoured during ramp paving.

*NEW* Mile marker 221 to 205, southbound – Overnight left lane closures for mowing, 8 p.m. to 6 a.m. Monday and Tuesday nights.

*NEW* Mile marker 221 to 223, northbound and southbound – Right shoulder closures for litter pickup operations, 11:30 a.m. to 12:30 p.m. Wednesday.

*UPDATE* Mile marker 221 to 227, northbound and southbound – Overnight single-lane closures including along southbound Exit 221 ramp to eastbound I-64 for installation of concrete barriers, 8 p.m. to 7 a.m. nights through June 7. Overnight left lane closures from mile marker 226 and 221 for installation of concrete barriers, 8 p.m. to 7 a.m. nights through June 7. Following barrier placement, shoulder closures remain in place 24/7 through spring 2026. Work is related to I-81 widening project.

Mile marker 221 to 223, northbound – Overnight alternating lane closures for paving operations on bridges over I-81 ramp and railway, 8 p.m. to 7 a.m. nights through June 20.

Mile marker 225 to 227, northbound and southbound – Overnight alternating lane closures for bridge maintenance, 8 p.m. to 7 a.m. nights through June 27.

*NEW* Mile marker 226 to 237, northbound – Overnight left lane closures for mowing, 8 p.m. to 6 a.m. Monday and Tuesday nights.

PRIMARY ROADS

*NEW* Route 11 (Lee Highway) – Southbound right shoulder closures between Route 781 (Bald Rock Road) and Route 1930 (Rolla Mill Road) for sign work, 8 a.m. to 5 p.m. Monday through Friday.

*UPDATE* Route 250 (Jefferson Highway) – Eastbound and westbound overnight alternating lane closures between I-81 interchange and Route 1427 (Rowe Road) for installation of concrete barriers, 8 p.m. to 7 a.m. through Thursday nights. Work is related to I-81 widening project.

Route 256 (Weyers Cave Road) – Flagger traffic control between Route 772 (Sulfur Pump Road) and Route 865 (Rockfish Road) for maintenance to bridge over Middle River, 7 a.m. to 5:30 p.m. through June 14.

SECONDARY ROADS

*UPDATE* Route 610 (Howardsville Turnpike) – Flagger traffic control between Route 855 (Mill Creek Lane) and Route 623 (Back Creek Lane) for utility work, 9 a.m. to 2:30 p.m. through June 13.

Route 619 (Purple Cow Road) – Flagger traffic control between Route 340 (East Side Highway) and Route 611 (Calf Mountain Road/Dooms Crossing Road) for utility pole installation, 9 a.m. to 2:30 p.m. through Thursday.

*UPDATE* Route 623 (Back Creek Lane) – Flagger traffic control between Route 610 (Howardsville Turnpike) and dead end for utility work, 9 a.m. to 2:30 p.m. through June 13.

Route 624 (South Delphine Avenue, Waynesboro) – Shoulder closures between South Oak Lane and Chinquapin Drive for work related to construction of Waynesboro Southern Corridor, through May 2025.

Route 635 (Barterbrook Road) – Closed between I-81 frontage roads (FR-217 and FR-218) for bridge replacement as part of I-81 southbound auxiliary lane project. Follow posted detour. Expected completion summer 2025.

*NEW* Route 662 (Greenville School Road) – Flagger traffic control between Route 1205 (Main Street, Greenville) and Route 608 (Cold Springs Road) for utility work, 9 a.m. to 2:30 p.m. June 3 – June 13.

Route 664 (Lyndhurst Road, Waynesboro) – Shoulder closures between Miami Avenue and Purdue Street for work related to construction of Waynesboro Southern Corridor, through June 30, 2025.

*NEW* Route 670 (Wagon Shop Road) – Flagger traffic control between Route 675 (Callison Mill Road) and Route 674 (Pilson Road) for utility work, 9 a.m. to 2:30 p.m. June 3 – June 13.

Route 675/670/604 (Broadhead School Road/McClures Mill Road) – Flagger traffic control between Route 919 (Old Providence Road) and Route 675 (Callison Mill Road) for utility work, 8 a.m. to 5 p.m. through June 27.

Various roads – Mobile traffic control for mowing operations. Flagger traffic control for drainage work, tree removal, shoulder repairs, pavement patching and brush cutting, 7:30 to 3 p.m. on weekdays.

ROCKINGHAM COUNTY

INTERSTATE 81

Mile marker 240 to 239, southbound – Overnight single-lane closures for repairs and maintenance to North River bridge, 8 p.m. to 7 a.m. through Thursday.

Mile marker 242 to 248, northbound and southbound – Overnight alternating lane closures as needed, 8 p.m. to 7 a.m. through December 2026. Overnight slow-roll closures as needed, 11 p.m. to 5 a.m. Expect delays. Traffic restrictions are related to Route 33 bridge and interchange project.

*UPDATE* Mile marker 248 to 243, southbound – Right shoulder closures for staging equipment for rock and soil testing, 8 a.m. to 5:30 p.m. through June 21.

*NEW* Mile marker 260 to 253, southbound – Right and left shoulder closures in various locations for pipe work, 7 a.m. to 5:30 p.m. Monday through Friday.

PRIMARY ROADS

*NEW* Route 33 (Spotswood Trail) – Eastbound and westbound right shoulder closures near Route 276/620 (Cross Keys Road/Indian Trial Road) intersection for sign work, 8 a.m. to 5 p.m. Monday through Friday.

Route 33 (East Market Street, Harrisonburg) – Overnight alternating eastbound and westbound closures between Vine Street/Hawkins Street and Terri Drive due to bridge work, 7 p.m. to 5 a.m. nights through January 2026. Shoulder closures and travel-lane shifts 24/7. Work zone speed limit 25 miles an hour with automated speed enforcement. Traffic restrictions are for Route 33 bridge replacements and interchange improvement.

Route 33 (Rawley Pike) – Flagger and pilot-truck traffic control between Dry Run Road and Switzer Lake Road for road widening project, 7:30 a.m. to 5 p.m. through August 30.

Route 259 (Lee Street/Brocks Gap Road) – Flagger traffic control between Broadway town limits and Route 1411 (Shenandoah Avenue) for utility work, 7 a.m. to 8 p.m. through June 28.

Various roads – Mobile traffic control for mowing operations. Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting, 7:30 a.m. to 3 p.m. on weekdays.

SECONDARY ROADS

No lane closures reported.

PAGE COUNTY

PRIMARY ROADS

*NEW* Various roads – Overnight mobile lane closures for pavement marking on parts of Business Route 211 (Main Street, Stanley), Route 211/340 (Lee Highway), Business Route 340 (Main Street, Luray) and Route 340, 8 p.m. to 5 a.m. Sunday (June 2) through Thursday nights.

Various roads – Mobile traffic control for mowing operations. Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting, 7:30 a.m. to 3 p.m. on weekdays.

SECONDARY ROADS

Various roads – Flagger traffic control for brush cutting and pipe cleaning, 7:30 a.m. to 3 p.m. on weekdays.

SHENANDOAH COUNTY

INTERSTATE 81

Mile marker 287 to 289, northbound and southbound – Overnight alternating lane closures for maintenance to Route 600 and Route 625 bridges, 8 p.m. to 6 a.m. nights through June 27.

*NEW* Mile marker 295 to 298, northbound and southbound – Right shoulder closures including along Exit 296 off-ramps for sign work, 8 a.m. to 5 p.m. Monday through Friday.

*UPDATE* Mile marker 296 to 299, northbound and southbound – Right shoulder closures including along Exit 298 off-ramp for utility installation, 7:30 a.m. to 7 p.m. through June 28.

PRIMARY ROADS

*NEW* Route 11 (North Massanutten Street, Strasburg) – Shoulder closures between Route 1967 (East Washington Street) and Route 55 (East King Street) for sign work, 8 a.m. to 5 p.m. Monday through Friday.

*NEW* Route 55 (John Marshall Highway, Strasburg) – Shoulder closures between Banks Fort Road and Mineral Street for sign work, 8 a.m. to 5 p.m. Monday through Friday.

*UPDATE* Route 55 (John Marshall Highway) – Westbound right shoulder closures around I-81 at exit 296 for utility work, 7:30 a.m. to 7 p.m. through June 14.

SECONDARY ROADS

*UPDATE* Route 629 (Oranda Road) – Flagger traffic control between Route 660 (Timberlake Road) and Route 850 (Quarry Lane) for utility work, 7:30 a.m. to 7 p.m. through June 14.

*NEW* Route 651 (Mount Olive Road) – Shoulder closures near Route 11 (Old Valley Pike) intersection for sign work, 8 a.m. to 5 p.m. Monday through Friday.

FREDERICK COUNTY

INTERSTATE 81

Mile marker 300 to 301, northbound and southbound – Overnight lane closures and traffic-lane shifts as needed, 8 p.m. to 7 a.m. through December 2024. Shoulder closures 24/7. Work zone speed limit 55 miles an hour. Work is related to southbound acceleration ramp extension and bridge widening with estimated completion in late 2024.

Mile marker 308 to 310, northbound and southbound – Overnight alternating lane closures for maintenance to bridge over Opequon Creek, 8 p.m. to 7 a.m. nights through June 27.

PRIMARY ROADS

*NEW* Route 7 (Berryville Pike) – Overnight eastbound and westbound alternating lane closures near I-81 interchange for maintenance bridge over I-81, 8 p.m. to 7 a.m. nights June 3 – June 13.

*NEW* Route 7 (Berryville Pike) – Eastbound alternating lane closures between Route 656 (Greenwood Road) and Clarke County line for tree trimming operations, 7 a.m. to 3:30 p.m. through June 12.

Route 7 (Berryville Pike) – Traffic pattern changes between Route 659 (Valley Mill Road) and Route 645 (Wrights Mill Road) due to new traffic signal at intersection with Hallowed Crossing Way.

Route 11 (Martinsburg Pike) – Northbound lane closures for pavement marking between Route 37 interchange and Route 839/661 (Amoco Lane/Welltown Road) for resurfacing operations, 9 a.m. to 2 p.m. through Friday.

Route 37 – Northbound and southbound left lane and right shoulder closures between Route 847/642 (Hillandale Lane/Tasker Road) and Route 11 (Martinsburg Pike) for mowing operations, 7 a.m. to 7 p.m. through Monday (June 3).

*NEW* Route 50/17 (Millwood Pike)– Westbound right lane closures between Route 728 (Victory Road) and Winchester City limits for ditch cleaning operations, 7 a.m. to 3:30 p.m. Monday through Friday.

*NEW* Route 522 (Front Royal Pike) – Northbound and southbound alternating lane closures between Clarke County line and Route 644 (West Parkins Mill Road) for ditch cleaning operations, 7 a.m. to 3:30 p.m. June 3 – June 12.

SECONDARY ROADS

Route 600 (Back Mountain Road) – Flagger traffic control between Route 753 (Rosenberger Lane) and Route 600 (South Hayfield Road) for utility work, 8 a.m. to 5 p.m. through June 28.

Route 627 (Reliance Road) – Shoulder closures just east of I-81 interchange for shoulder widening, 7 a.m. to 6 p.m. through June 28.

Route 661 (Redbud Road) – Flagger traffic control between Route 662 (Milburn Road) and Route 660 (Woods Mill Road) for road maintenance, 9 a.m. to 3:30 p.m. through December 31.

Route 662 (Milburn Road) – Flagger traffic control between Route 661 (Redbud Road) and Route 761 (Old Charles Town Road) for road maintenance, 9 a.m. to 3:30 p.m. through December 31.

Route 839 (Amoco Lane) – Flagger traffic control between Route 11 (Martinsburg Pike) and dead end for resurfacing operations, 9 a.m. to 3 p.m. through Friday.

Route 1322 (Brooke Road) – Flagger traffic control near intersection with Fort Collier Road for utility work, 7:30 a.m. to 4 p.m. through June 14.

CLARKE COUNTY

PRIMARY ROADS

Route 7 (Harry Byrd Highway) – Eastbound and westbound single lane closures between Route 606 (River Road) and Route 601 (Blueridge Mountain Road) for shoulder widening and rumble strip installation. Eastbound lane closures 9: a.m. to 8:30 p.m. weekdays. Westbound lane closures between 8 p.m. and 1 p.m. weekdays or weeknights. Estimated completion October 31.

Route 340 (Lord Fairfax Highway) – Northbound and southbound overnight single lane closures between Berryville town limits and Route 658 (White Post Road) for pavement marker installations, 8 p.m. to 6 a.m. nights through Monday (June 3).

*NEW* Route 522 (Stonewall Jackson Highway) – Northbound and southbound alternating lane closures between Frederick County line and Route 277/340 (Fairfax Pike/Lord Fairfax Highway) for ditch cleaning operations, 7 a.m. to 3:30 p.m. June 3 – June 12.

SECONDARY ROADS

No lane closures reported.

WARREN COUNTY

INTERSTATE 66

*NEW* Mile marker 0 to 6, eastbound and westbound – Right shoulder closures for litter pickup operations, 12 noon to 1 p.m. Monday.

*UPDATE* Mile marker 0 to 7, eastbound – Right shoulder closures for utility work, 7:30 a.m. to 7 p.m. through June 28.

*UPDATE* Mile marker 11 to 12, eastbound – Alternating lane closures for inspection of Route 647 (Dismal Hollow Road) bridge, 8 a.m. to 3 p.m. Friday.

INTERSTATE 81

*UPDATE* Mile marker 299 to 300, northbound – Right shoulder closures for utility work, 7:30 a.m. to 7 p.m. through June 28.

Mile marker 299 to 300, northbound and southbound – Overnight lane closures and traffic-lane shifts as needed, 8 p.m. to 7 a.m. through December 2024. Shoulder closures 24/7. Work zone speed limit 55 miles an hour. Work is related to southbound acceleration ramp extension and bridge widening with estimated completion in late 2024.

PRIMARY ROADS

No lane closures reported.

SECONDARY ROADS

*NEW* Route 638 (Howellsville Road) – Stop and proceed traffic control near Route 685 (Patty Tract Lane) intersection for bridge work, 8 a.m. to 4 p.m. Monday through Saturday.

Route 658 (Rockland Road) – Closed to through traffic between Route 340/522 (Winchester Road) and Route 705 (Fishnet Boulevard) for construction of bridge over Norfolk Southern Railway. Estimated completion December 2025.

Vegetation management may take place district wide on various routes. VDOT reminds motorists to use extreme caution when traveling through work zones.

For updated traffic alerts and traveler information, dial 511 or visit https://www.511virginia.org.

The VDOT Customer Service Center can assist with reporting road hazards, asking transportation questions, or getting information related to Virginia’s roads. Call 800-FOR- ROAD (800-367-7623) or use its mobile friendly website at https://my.vdot.virginia.gov. Agents are available 24 hours-a-day, seven days a week.

The VDOT Staunton District is on Facebook and X (Twitter). Follow VDOT statewide accounts on Facebook, X (Twitter), YouTube, Instagram, LinkedIn and Flickr. The VDOT Web page is located at http://www.vdot.virginia.gov.

LYNCHBURG DISTRICT

TRAFFIC ALERT

June 3-9, 2024

LYNCHBURG, Va. – Highway work requiring road/lane/structure closures is planned;

however, work may be delayed/canceled due to weather or other issues. Items in

italics contain new/updated information. For up-to-date information, call 511 or visit

www.511Virginia.org.

District-wide activities:

Crews will perform various activities throughout the district to include, but are not limited

to bridge & guardrail maintenance, brush/tree/limb cutting, pothole/surface/shoulder work,

surface treatment/paving operations, work orders, mowing, boom axing, drainage repairs/

work and roadside cleanup.

Work at specific locations:

Amherst County:

Route 29 & Route 151 (Patrick Henry Hwy.) – Construction of a Restricted Crossing U-

Turn, storm drainage, advanced warning flashers, traffic lighting. The Route 608

(Toytown Rd.) crossover is closed for Phase One of construction. Estimated reopening of

crossover July 2024. Use caution and watch for changes in the traffic pattern during

construction. Estimated project completion November 2024.

Please note district-wide activities above.

Appomattox County:

Route 131 (Old Courthouse Rd.) from Route 460 BUS (Confederate Blvd.) to Route 460

Bypass (Richmond Highway) – Route 131 Reconstruction. Traffic shift in place. Lane

closures expected. Use caution. Estimated completion January, 2025.

Please note district-wide activities above.

Buckingham County:

Route 608 (Elcan Rd.) – Pipe replacement. Route 608 (Elcan Rd.) will be closed from

Route 636 (Francisco Rd.) to Route 635 (Buckingham Springs Rd.) from May 16, 2024 to

approximately May 30, 2024.

Please note district-wide activities above.Campbell County:

Route 460 (Richmond Highway) from Route 817 (Pleasant Valley Rd.) to Route 726 (Mt.

Athos Rd.) – Safety improvements. Shoulder widening, rumble strips, guardrail

replacement. Lane closures expected on weekend of June 8, 2024, weather permitting.

Use caution.

Please note district-wide activities above.

Charlotte County:

Route 664 (Butterwood Rd.) – pipe replacement. Detour in place. Expected completion

June 14, 2024.

Route 15 (Farmville Highway) at Route 15/360 BUS (Four Locust Highway) – Roundabout

project. Change in traffic pattern now in place allowing two-way movement along Route

15/360 BUS (Four Locust Highway) and a stop condition for Rte. 15 (Farmville Highway)

southbound traffic. The on-ramps from Route 15 to the Route 15/360 (Kings Highway) and

the off-ramp from Route 15/360 (Kings Highway) to Route 15 are closed to traffic.

Message boards and detour signage will alert motorists to the change and direct traffic

along the detour. Estimated overall project completion October 2024.

Please note district-wide activities above.

Cumberland County:

Route 45 (Cartersville Rd.) at Route 690 (Columbia Rd.) – Roundabout Project. Speed limit

has been reduced to 35 mph through the work zone. Expect changes in traffic patterns

beginning June 5, weather permitting, with grade changes along Rte. 45. Traffic will be

running on stone during this time and lane closures are expected. Use caution. Estimated

completion November 2024.

Please note district-wide activities above.

Halifax County:

Route 360 (James D. Hagood Highway) from Route 716 (Wolf Trap Rd.) to Route 344

(Scottsburg Rd.) – Safety improvements. Shoulder widening, rumble strips, guardrail

replacement. Lane closures expected. Use caution. Estimated completion November 2024.

Route 501 (L P Bailey Memorial Highway) at Route 628 (Chestnut Road) – Intersection

improvement project. Shoulder and lane closures expected. Temporary traffic signals in

place maintaining one lane of traffic along Route 501 and Route 628 until approximately the

end of August, 2024. Use caution. Estimated overall project completion December 2024.

Route 645 (State Shed Rd.) – Culvert repair – Route 645 is closed. Detour is in place.

Estimated completion May 31, 2024

Please note district-wide activities above.

Nelson County:

Route 29, between Route 6 (River Rd.) and Route 718 (Mountain Cove Rd.) – Shoulder

widening, rumble strip installation, guardrail installation. Work to begin March 18 and cause

alternating lane closures. Estimated completion January 2025.

Route 60 (Richmond Highway) over James River – Bridge deck replacement. Lane

closures and changes in traffic patterns in effect. Traffic is utilizing the other side of the

bridge to cross. Estimated completion July 2024.

Please note district-wide activities above.Pittsylvania County:

Route 631 (Dews Rd.) – Culvert Repairs. Route 641 (Dews Rd.) will be temporarily

closed to through traffic from May 29, 2024 to approximately June 7, 2024.

Route 656 (Kerns Church Rd.) – Culvert repairs. Beginning May 29, Route 656 will

be closed to through traffic from Route 712 (White Ridge Road), to the intersection of

Route 713 (Rock Springs Road). Estimated opening June 30, 2024.

Route 761 (Straightstone Rd.) – Bridge Replacement. Route 761 (Straightstone

Road) will be temporarily closed to through traffic from Route 604 (Glade Road), to

the intersection of Route 604 (Glade Road) from June 10, 2024 to approximately

August 8, 2024.

Please note district-wide activities above.

Prince Edward County:

Route 665 (Worsham Road) – Bridge Replacement. Route 665 (Worsham Road) is

closed to through traffic from Route 15 (Farmville Road) to the intersection of Route

630 (Redd Shop Road). A detour with signs is in effect, using Route 15 to Route

628 (Granite Falls Blvd.) to Route 630 (Oak Ridge Road) back to Route 665.

Estimated completion May 31, 2024.

Please note district-wide activities above.

 

SCHEDULED CONSTRUCTION AND MAINTENANCE WORK

CULPEPER DISTRICT: June 3-7, 2024

CULPEPER — The following highway work is scheduled, weather permitting, in the Culpeper District during the next week. Traffic movements may be restricted and speed limits reduced in work zones. (NEW) or(UPDATE) indicate revisions since last week’s report.

Culpeper District traffic information is also available on Twitter at @VaDOTCulp and on VDOT’s website athttp://www.virginiadot.org/travel/travel_alerts/culpeper/default.asp.

Albemarle County 

(NEW) New roadway construction – Expect land shoulder closures in the following areas:

  • Interstate 64, left lane and left shoulder closures between mile marker 102 and mile marker 103 in the eastbound and westbound lanes, Monday through Thursday, 7 p.m. to 5 a.m.
  • Route 1403 (Berkmar Drive), right lane and right shoulder closure between Route 1438 (Hilton Heights Road) and Route 1417 (Woodbrook Drive) in the southbound lanes, daily, 7 a.m. to 5 p.m.

(NEW) Roadway sweeping – Expect mobile, alternating lane closures, 3:30 a.m. to 11:30 a.m. in the following areas:

  • U.S. 250 (Long Street), between the Charlottesville City line and Route 1777 (Hansens Mountain Road) in the eastbound and westbound lanes, Monday and Tuesday.
  • Route 20 (Stony Point Road), between U.S. 250 (Richmond Road) and Route 1421 (Elk Drive) in the northbound and southbound lanes, Monday and Tuesday.
  • Route 631 (Rio Road East), between U.S. 29 (Seminole Trail) and the Charlottesville City line, Friday.

(NEW) Ditch cleaning – Expect lane and shoulder closures in the following areas:

  • Interstate 64, right shoulder closures between mile marker 123 and mile marker 125 in the eastbound lanes, Monday through Friday, 9 a.m. to 3 p.m.
  • Interstate 64, mobile, alternating lane closures between mile marker 100 and mile marker 124 in the eastbound lanes, daily through Friday, 9 a.m. to 3 p.m.

(NEW) Litter pick-up – Expect mobile work zone with right shoulder closures, Tuesday, in the following areas:

  • Interstate 64, between mile marker 118 and mile marker 119 in the eastbound lanes, 1 p.m. to 1:30 p.m.
  • Interstate 64, between mile marker 118 and mile marker 119 in the westbound lanes, 10 a.m. to 10:30 a.m.
  • Interstate 64, between mile marker 123 and mile marker 125 in the westbound lanes, 9 a.m. to 10 a.m.

(NEW) Bridge inspections – Expect shoulder and lane closures in the following areas:

  • Interstate 64, alternating lane closures between mile marker 130 and mile marker 132 in the eastbound and westbound lanes, 8 p.m. Sunday to 6 a.m. Monday
  • Interstate 64, between mile marker 122 and mile marker 125, alternating lane closures in the eastbound and westbound lanes, 8 p.m. Wednesday to 6 a.m. Thursday.
  • Interstate 64, alternating lane closures between mile marker 109 and mile marker 112 in the eastbound and westbound lanes, 8 p.m. Monday to 6 a.m. Tuesday.
  • Interstate 64, right shoulder closures between mile marker 110 and mile marker 111 in the westbound lanes, Tuesday through Friday, 9 a.m. to 3 p.m.
  • U.S. 250 (Richmond Road), alternating lane closures at the Albemarle County and Charlottesville City line in the eastbound and westbound lanes, 9 p.m. Tuesday to 5 a.m. Wednesday.

(UPDATE) Paving – Expect Lane closures in the following areas:

  • Route 649 (Proffit Road), mobile, alternating lane closures between Quarles Road and Route 830 (Colonial Drive) in the northbound and southbound lanes, Monday and Tuesday, 8 a.m. to 3 p.m.
  • Route 676 (Woodlands Road), alternating lane closures between Route 1548 Beau Mont Farm Road) and Route 1050 (Rivanwood Drive in the northbound and southbound lanes, Monday through Friday, 7 a.m. to 7 p.m.

Bridge superstructure repairs/replacement – Expect lane and shoulder closures in the following areas:

  • Route 20 (Scottsville Road), temporary traffic signal with new traffic pattern at Route 708 (Red Hill Road). Route 708 is narrowed to one lane for construction on the bridge over the North Fork Hardware River in the southbound lanes. Please expect delays during high volume times of the day. Project completion date, Dec. 4, 2024.
  • Route 671 (Davis Shop Road), road closed between Route 601 (Free Union Road) and Route 664 (Markwood Road). Please follow signed detour around the work area. Crews are replacing part of the bridge. Project completion date is June 7.

Bridge repairs – Expect alternating lane closures, daily, 7 a.m. to 5 p.m. in the following areas:

  • Route 637 (Dick Woods Road), between Rock Mills Road and Route 177 (Langford Drive) in the eastbound and westbound lanes.
  • Route 691 (Greenwood Road), between U.S. 250 (Rockfish Gap Turnpike) and Route 690 (Greenwood Station Road) in the northbound and southbound lanes.
  • Route 744 (Hacktown Road), between U.S. 250 (Richmond Road) and Route 731 (Keswick Road) in the northbound and southbound lanes.

(UPDATE) Utility work under VDOT permit – Expect lane and shoulder closures in the following areas:

  • U.S. 29 (Monacan Trail), right lane and right shoulder closures between Route 633 (Heards Mountain Road) and Route 699 (Boaz Road), daily, starting Wednesday, 9 a.m. to 3 p.m.
  • U.S. 250 (Rockfish Gap Turnpike), alternating lane closures between Route 240 (Crozet Avenue) and Route 797 (Hillsboro Lane) in the eastbound and westbound lanes, daily, 9 a.m. to 3:30 p.m.
  • Route 240 (Three Notch’d Road), alternating lane closures between Route 240 (Crozet Avenue) and U.S. 250 (Ivy Road) in the eastbound and westbound lanes, daily, 9 a.m. to 3:30 p.m.
  • Route 240 (Crozet Avenue), alternating lane closures between Route 691 (Tabor Street) and Route 240 (Three Notch’d Road) in the northbound and southbound lanes, daily, 9 a.m. to 3:30 p.m.
  • Route 797 (Hillsboro Lane), right shoulder closures between U.S. 250 (Rockfish Gap Turnpike) and Route 684 (Half Mile Branch Road, daily 9 a.m. to 3:30 p.m.

New Roadway Construction – Construction of a roundabout at Route 743 (Hydraulic Road) and Hillsdale Drive. Expect lane and shoulder closures with flaggers in the following areas nightly, Monday through Thursday, 9 p.m. to 6 a.m., 10 p.m. Friday to 9 a.m. Saturday, 9 p.m. Saturday to 10 a.m. Sunday, 8 p.m. Sunday to 6 a.m. Monday, through May 5.

  • Route 743 (Hydraulic Road), between U.S. 29 (Emmet Street North) and Brandywine Drive, nightly in the southbound lanes.
  • Route 743 (Hydraulic Road), between U.S. 29 (Emmet Street North) and Cedar Hill Road in the northbound and southbound lanes.

(UPDATE) Interstate 64 – Other construction. Expect lane and shoulder closures between mile marker 102 and mile marker 107 in the eastbound and westbound lanes, Monday through Thursday, 7 p.m. to 5 a.m.

Interstate 64 – Bridge painting. Expect left lane and left shoulder closures between mile marker 128 and mile marker 130 in the eastbound lanes 7 p.m. Saturday, June 1 to 10 a.m. Sunday.

Route 620 (Rolling Road – Tree trimming. Expect alternating lane closures between Route 795 (Presidents Road) and the Fluvanna County line in the northbound and southbound lanes, daily, through Monday, 8 a.m. to 5 p.m.

Route 641 (Frays Mill Road) – Other bridge work. Road closed at Route 743 (Advance Mills Road) for replacement of bridge over Marsh Run. Drivers on U.S. 29 (Seminole Trail) who need to access Route 743 north and west of the closure should use Route 607 (Cedar Grove Road). Expected completion date, Dec. 5, 2024.

(NEW) Route 676 (Woodlands Road) – Line painting. Expect mobile, alternating lane closures between Route 1050 (Rivanwood Drive) and Route 1548 (Beau Mont Farm Road) in the northbound and southbound lanes, Monday through Friday, 7 a.m. to 7 p.m.

Route 797 (Hillsboro Lane) – Rehabilitation project. Expect alternating lane closures between Route 684 (Half Mile Branch Road) and U.S. 250 (Rockfish Gap Turnpike) in the eastbound and westbound lanes, daily, 9 a.m. to 3:30 p.m.

(NEW) U.S. 29 (Seminole Trail) – Signal installation. Expect right shoulder closures at Route 1417 (Woodbrook Drive) in the southbound lanes, Monday and Tuesday, 7 a.m. to 5 p.m.

City of Charlottesville

Road improvements — Expect lane and shoulder closures with flaggers Monday through Thursday, 9 p.m. to 6 a.m., 10 p.m. Friday to 9 a.m. Saturday, 9 p.m. Saturday to 10 a.m. Sunday, 8 p.m. Sunday to 6 a.m. Monday, nightly in the following areas:

  • U.S. 250 (Bypass Expressway), between U.S. 29 (Emmet Street North) and Dairy Road in the eastbound and westbound lanes.
  • Route 743 (Hydraulic Road), between U.S. 29 (Emmet Street North) and Brandywine Drive in the northbound and southbound lanes.

Culpeper County

(NEW) Herbicide spraying – Expect mobile, alternating lane closures, Monday through Friday, 8:30 a.m. to 4:30 p.m. in the following areas:

  • U.S. 15 (James Madison Highway), between Route 721 (White Oak Road and the Fauquier County line.
  • U.S. 522 (Zachary Taylor Highway), between Route 647 (Twin Mountains Road) and the Rappahannock County line.

Road widening projects – Expect shoulder and lane closures in the following areas:

  • Route 3 (Germanna Highway), right lane and right shoulder closures between Route 739 (Clay Hill Road) and Route 669 (Carrico Mills Road) in the eastbound lanes, daily, 9 a.m. to 3 p.m.
  • Route 646 (Old Stillhouse Road), alternating lane closures between Route 628 (Weslyn Drive) and Route 635 (Hazeland Lane) in the northbound and southbound lanes, daily, 6:30 a.m. to 5:30 p.m.

(UPDATE) Utility work under VDOT permit – Expect alternating lane closures in the following areas:

  • Route 667 (Nalles Mill Road), alternating lane closures between Route 799 (Keyser Road) and the Culpeper Town line in the westbound lanes, daily, 9 a.m. to 3:30 p.m.
  • Route 669 (Carrico Mills Road), alternating lane closures between Route 3 (Germanna Highway) and Route 672 (Stones Mill Road) in the northbound and southbound lanes, daily, 9 a.m. to 3 p.m.

(NEW) U.S. 29 (James Monroe Highway) – Bridge inspection. Expect right lane and right shoulder closures at the Madison County in the northbound and southbound lanes, Monday, 9 a.m. to 9 p.m.

(NEW) U.S. 29 (James Madison Highway) – Milling. Expect alternating lane closures at the ramp to U.S. 522 (Germanna Highway) in the southbound lanes, Tuesday and Wednesday, 6 p.m. to 4 a.m.

(NEW) Route 685 (Chestnut Fork Road) – Turn lane construction. Expect alternating lanes closures between Route 229 (Rixeyville Road) and Route 761 (Ridgelea Avenue) in the eastbound and westbound lanes, Monday through Friday, 7 a.m. to 5 p.m.

Fauquier County

Utility work under VDOT permit – Expect lane and shoulder closures in the following areas:

  • Route 626 (Halfway Road), mobile, alternating lane closures between Route 627 (Hulberts Lane) and the Loudon County line in the northbound and southbound lanes, daily, 9 a.m. to 3 p.m.
  • Route 690 (Bear Wallow Road), alternating lane closures between Filly Lane and the Warrenton Town line in the northbound and southbound lanes, daily, 9 a.m. to 3 p.m.

(NEW) Herbicide spraying – Expect mobile, alternating lane closures, Monday through Friday, 8:30 a.m. to 4:30 p.m. in the following areas:

  • Route 28 (Catlett Road), between U.S. 15 (James Madison Highway) and Route 843 (Old Nokesville Road) in the northbound and southbound lanes.
  • Route 55 (John Marshall Highway), between Route 600 (Beverlys Mill Road) and the Warren County line.

(NEW) Interstate 66 – Bridge inspection. Expect right shoulder closures between mile marker 33 and mile marker 35 in the westbound lanes, Tuesday, 9 a.m. to 1 p.m.

(UPDATE) Interstate 66 – Bridge deck repairs. Expect alternating lane closures between mile marker 31 and mile marker 33. The exit ramp to Route 245 (Old Tavern Road) will be closed in the westbound lanes. Please use caution through the work zone and expect delays. Use alternate routes if possible. Sunday through Saturday, 9 p.m. to 1 p.m.

(UPDATE) Interstate 66 – Tree trimming. Expect right shoulder closures between mile marker 18 and mile marker 21 in the eastbound and westbound lanes, Monday through Friday, 7 a.m. to 5 p.m.

(UPDATE) Interstate 66 – Ditch cleaning. Expect alternating lane closures between mile marker 22 and mile marker 30 in the eastbound and westbound lanes, Monday through Friday, 7 a.m. to 3:30 p.m.

(UPDATE) U.S. 17 (Broadview Avenue) – Roadway improvements. Expect intermittent lane closures between Hospital Drive and Winchester Street in the northbound and southbound lanes, Monday through Friday, 8 p.m. to 6 a.m.

(NEW) Route 643 (Meetze Road) – Line painting. Expect mobile, alternating lane closures between Route 28 (Catlett Road) and Route 672 (Duhollow Road) in the northbound lanes, Monday through Friday, 7 a.m. to 7 p.m.

(NEW) Route 616 (Bristersburg Road) – Paving. Expect mobile, alternating lane closures between Route 806 (Elk Run Road) and Route 1630 (Beaver Dam Road) in the northbound and southbound lanes, daily, starting Wednesday, 8 a.m. to 5:30 p.m.

(NEW) Route 622 (Whiting Road) – Shoulder repairs. Expect alternating lane closures between Route 55 (John Marshall Highway) and Route 622 dead end, daily, through Friday, 8 a.m. to 5:30 p.m.

(NEW) Route 804 (Stuart Street) – Other maintenance. Expect right shoulder closures between Ewell Street and Route 626 (Loudoun Avenue) in the eastbound lanes, Monday, 8 a.m. to 6 p.m.

Louisa County

(NEW) Bridge inspections – Expect alternating lane closures, 8 a.m. to 5 p.m. in the following areas:

  • Route 652 (Kentucky Springs Road), between Route 1064 (Randolph Street) and Route 1290 (Cooke Lane) in the northbound and southbound lanes, Wednesday.
  • Route 652 (Kentucky Springs Road), between Route 1035 (Pine Point Place) and Route 614 (Elk Creek Road) in the northbound and southbound lanes, Tuesday.

Signal repairs – Expect alternating lane closures, daily, 9 a.m. to 3 p.m. in the following areas:

  • U.S. 15 (James Madison Highway) at Route 187 (Spring Creek Parkway) in the northbound and southbound lanes.
  • U.S. 15 (James Madison Highway) at Exit 136 in the northbound and southbound lanes.
  • U.S. 33 (Jefferson Highway), between Courthouse Square and Route 1020 (Club Road) in the eastbound and westbound lanes.
  • U.S. 250 (Three Notch Road) at U.S. 15 (James Madison Highway) in the eastbound and westbound lanes.
  • U.S. 522 (Mineral Avenue) at Route 618 (East First Street) in the northbound and southbound lanes.
  • Route 22 (Louisa Road) at U.S. 15 (James Madison Highway) in the eastbound and westbound lanes.
  • Route 208 (Courthouse Square), at Route 1009 (Woolfolk Avenue) in the northbound and southbound lanes, daily.
  • Route 1004 (Rosewood Avenue) at Route 628 (Fredericksburg Avenue) in the eastbound and westbound lanes.

(UPDATE) Paving – Expect alternating lane closures in the following areas:

  • Route 22 (Davis Highway), between Onionville Road and Route 767 (School Bus Road) in the eastbound and westbound lanes, daily, 7:30 a.m. to 7:30 p.m.
  • Route 208 (Zachary Taylor Highway), mobile, alternating lane closures between U.S. 522 (Mineral Avenue) and Route 850 (Anna Coves Boulevard) in the eastbound and westbound lanes, daily, 7 a.m. to 7 p.m.

Construction of a new roundabout – Expect alternating lane closures daily, 7 a.m. to 6 p.m. in the following areas. Project anticipated completion date, Jan. 31, 2025.

  • U.S. 522 (Zachary Taylor Highway) between Route 623 (Chopping Road) 0.3 miles north of Route 208 (New Bridge Road) in the northbound and southbound lanes.
  • Route 208 (New Bridge Road) between U.S. 522 (Zachary Taylor Highway) and Alma Gaynelle Drive in the eastbound and westbound lanes.

Madison County

(NEW) Utility work under VDOT permit – Expect lane and shoulder closures in the following areas:

  • U.S. 29 (South Seminole Trail), both shoulders closed between Route 677 (Estes Lane) and Route 230 (Orange Road) in the northbound and southbound lanes, daily, starting Thursday, 9 a.m. to 3:30 p.m.
  • U.S. 29 (South Seminole Trail), intermittent road closures between Route 677 (Estes Lane) and Route 230 (Orange Road), nightly, starting Tuesday, 9 p.m. to 6 a.m.
  • U.S. 29 (South Seminole Trail), both shoulders closed between Route 621 (Seville Road) and Route 609 (Fredericksburg Road) in the northbound and southbound lanes, nightly, starting Tuesday, 9 p.m. to 6 a.m.

(UDATE) U.S. 29 (South Seminole Trail) – New roadway construction. Expect alternating lane closures between Route 662 (Shelby Road) and Route 677 (Estes Lane) in the northbound and southbound lanes, daily, 6 a.m. to 6 p.m.

(NEW) Route 231 (Blue Ridge Turnpike) – Herbicide spraying. Expect mobile, alternating lane closures between the Orange County line and Route 602 (Nethers Road) in the northbound and southbound lanes, Monday through Friday, 8:30 a.m. to 4:30 p.m.

Orange County

(NEW) U.S. 522 (Zachary Taylor Highway) – Herbicide spraying. Expect mobile, alternating lane closures between the Spotsylvania County line to the Culpeper County line in the northbound and southbound lanes, Monday through Friday, 8:30 a.m. to 4:30 p.m.

(NEW) Route 231 (Blue Ridge Turnpike) – Bridge inspection. Expect alternating lane closures between Route 641 (Liberty Mills Road) and the Madison County line in the northbound and southbound lanes, Monday and Tuesday, 9 a.m. to 6 p.m.

(NEW) Route 601 (Flat Run Road) Paving. Expect alternating lane closures with flaggers between Route 20 (Constitution Highway) and Route 3 (Germanna Highway) in the northbound lanes, daily, through Friday, 7 a.m. to 7 p.m.

Rappahannock County

(NEW) U.S. 522 (Zachary Taylor Highway) – Paving. Expect alternating lane closures between Route 635 (Hume Road) and the Warren County line in the northbound and southbound lanes, daily, through Monday, 7 a.m. to 7 p.m.

(NEW) U.S. 522 (Sperryville Pike) – Herbicide spraying. Expect mobile, alternating lane closures between Route 707 (Slate Mills Road) and the Warren County line in the northbound and southbound lanes, Monday through Friday, 8:30 a.m. to 4:30 p.m.

Road conditions and other real-time travel information can be found on the 511 Virginia website,

the free VDOT 511 mobile app or by calling 511 from any phone in Virginia. VDOT updates are also on theCulpeper District Facebook page and the district’s Twitter account, @VaDOTCulp.

(END)

VDOT’s nine-county Culpeper District includes the counties of Albemarle, Culpeper, Fauquier, Fluvanna, Greene, Louisa, Madison, Orange and Rappahannock. The independent city of Charlottesville maintains its own roads.

LEAVE A REPLY

Please enter your comment!
Please enter your name here