VDOT Weekly Traffic Alert Report – February 20-26, 2023

0
701

 

 

LYNCHBURG DISTRICT TRAFFIC ALERT February 20-26, 2023

LYNCHBURG, Va. – Highway work requiring road/lane/structure closures is planned; however, work may be delayed/canceled due to weather or other issues. Items in italics contain new/updated information. For up-to-date information, call 511 or visit www.511Virginia.org. District-wide activities: Crews will perform various activities throughout the district to include, but are not limited to bridge & guardrail maintenance, brush/tree/limb cutting, pothole/surface/shoulder work, surface treatment operations, work orders, mowing, boom axing, drainage repairs/work and roadside cleanup.Work at specific locations:

Amherst County: Please note district-wide activities above.

Appomattox County: Please note district-wide activities above. Bedford County:Route 221 (Forest Rd.) intersections Route 1425 Graves Mill and Route 1426 Gristmill Rd. Lane closures and changes in traffic pattern are likely. Expect lane closures on Rte. 221. Also, between the hours of 9 p.m. 6 a.m., Graves Mill will be closed between Rte. 221 and Gristmill Rd. Traffic will be detoured through Gristmill Rd. Signing, Barricades, Flaggers and Police will be in place to direct traffic. Started May 1 2022 and est. comp. May 18, 2023.Please note district-wide activities above.

Buckingham County: Route 602 over the James River – Bridge Painting. Temporary traffic signals will be utilized to control traffic beginning on January 16, 2023 and will be in operation until late February 2023 on Route 626 and its connection with Route 602. Route 671 over Slate River, just east of Route 611 (Diana Mill Road) – Bridge Painting. Lane Closures. Temporary traffic signals will be utilized to control traffic beginning on January 30 and will be in operation until late February 2023. Please note district-wide activities above.

Campbell County: Route 29 N over NSRR, near airport –Bridge and approach work; est. comp. May 2023. Route 29B Timberlake Road intersection Route 622 Waterlick Road – Safety improvement project lane closures changes in traffic pattern are likely Starting May 1. Estimated completion May 12, 2023. Crews will be working in the median on Timberlake Road between Tomahawk Drive and Homewood Drive. Signs and Flaggers will be in place to direct traffic. Please note district-wide activities above.

Charlotte County: Please note district-wide activities above. Cumberland County: Please note district-wide activities above.

Halifax County: Routes 501 & 610 – Passing lane project. Lane closures and shoulder closures will continue as needed with work along the shoulders. Fixed completion- May 5, 2023. Route 733 – Bridge replacement project. Route 733 (East Hitesburg Rd.) will be closed to thru traffic between Route 602 (Hitesburg Church Rd.) and Route 734 (Red Banks Rd.) from January 30, 2023 through May 5, 2023. VDOT will provide adequate signs for the closure and detour during the closure. The detour will use Route 602 (Hitesburg Church Rd.) to Route 734 (Red Banks Rd.) back to Route 733 (East Hitesburg Rd.) Please note district-wide activities above.

Lynchburg: Route 29/460 (Campbell Ave–Concord Turnpike) – Bridge replacement. Northbound 29/ eastbound and westbound 460 speed limit 45 mph. Lane closures changes in traffic pattern are likely. Completion July 31, 2023. **On Thursday, Feb. 23, beginning at 7 p.m. and going overnight, expect delays due to girder erection. The west/south right lane will be closed. Please note district-wide activities above.

Nelson County: Route 60 over James River – Bridge Deck replacement. Lane closures and changes in traffic patterns rescheduled and began the week of June 6. Est. comp July 14, 2024. Route 626 over Tye River – Bridge Painting. Lane closures with flagging operations will occur daily beginning January 23, 2023 and lasting until mid-February 2023 at the connection of Route 626 (Norwood Rd.) and Route 655 (Variety Mills Rd.) Route 723 (Old Roseland Road) – Culvert Replacement. Route 723 (Old Roseland Road) will be closed to thru traffic from Route 151 (Patrick Henry Highway) to the intersection of Route 655 (Roseland Road) from February 13, 2023 to approximately April 7, 2023. A detour will be in place with signage. The detour will utilize Route 151 (Patrick Henry Highway) to Route 655 (Roseland Road) back to Route 723 (Old Roseland Road). Please note district-wide activities above.

Pittsylvania County: Route 29 at Bannister River – Road closure for bridgework. Motorists should expect delays on Route 29 at the Bannister River in the Tightsqueeze area of Pittsylvania County. The northbound bridge will close for repair and both north and south traffic will cross the southbound bridge. Bridgework began April 4, 2022 and is continuing until approximately August of 2023. Please note district-wide activities above.

Prince Edward County: Please note district-wide activities above.

SCHEDULED CONSTRUCTION AND MAINTENANCE WORK

CULPEPER DISTRICT: Feb. 20-24, 2023

CULPEPER — The following highway work is scheduled, weather permitting, in the Culpeper District during the next week. Traffic movements may be restricted and speed limits reduced in work zones. (NEW) or (UPDATE) indicate revisions since last week’s report.

Culpeper District traffic information is also available on Twitter at @VaDOTCulp and on VDOT’s website at http://www.virginiadot.org/travel/travel_alerts/culpeper/default.asp.

Albemarle County

(UPDATE) Albemarle Design-Build Projects – Be alert for construction activities in the following areas:

  • U.S. 250 (Richmond Road) at Interstate 64. Construction of diverging diamond interchange. Speed limit is reduced to 25 miles per hour. Expect shoulder closures, and stay alert for crews through the work zone.

  • U.S. 250 (Rockfish Gap Turnpike) at Route 151 (Critzer Shop Road). New roundabout. Be alert for equipment and workers near the travel lanes. Speed limit is reduced to 25 miles per hour. Expected completion date is Feb., 2023. Expect flagging operations Monday through Friday, 7 a.m. to 6:30 p.m. in the following areas:

    • U.S. 250 (Rockfish Gap Turnpike) between Route 172 (Little Rock Lane) and Route 692 (Plank Road) in the eastbound and westbound lanes.

    • Route 151 (Critzer Shop Road) between U.S. 250 (Rockfish Gap Turnpike) and Route 803 (Goodloe Lane), in the northbound and southbound lanes.

(UPDATE) Utility work under VDOT permit – Expect lane and shoulder closures in the following areas:

  • U.S. 29 (Seminole Trail), right lane closure between Route 854 (Carrsbrook Drive) and Ridgewood Drive in the northbound lanes, Monday through Friday, 8 p.m. to 6 a.m.

  • Route 1403 (Berkmar Drive) will be closed between Route 1438 (Hilton Heights Road) and Route 631 (Rio Road) in the northbound and southbound lanes, daily.

Interstate 64 – Brush removal. Expect left lane and left shoulder closures between mile marker 123 and mile marker 124, Monday through Friday, 9 a.m. to 2 p.m.

U.S. 29 (Monacan Trail) — Pipe repairs/installation. Expect left lane closures between Route 804 (Thackers Lane) and Route 633 (Cove Garden Road) in the northbound and southbound lanes, daily, 8 a.m. to 5 p.m.

(NEW) Route 22 (Louisa Road) – Shoulder repairs. Expect mobile, alternating lane closures between U.S. 250 (Richmond Road) and Route 231 (Gordonsville Road) in the eastbound and westbound lanes, Tuesday through Thursday, 9 a.m. to 2:30 p.m.

(NEW) Route 231 (Gordonsville Road) – Debris pick-up. Expect mobile, alternating lane closures between Route 22 (Louisa Road) and the Louisa County line in the northbound and southbound lanes, Tuesday through Thursday, 9 a.m. to 2:30 p.m.

City of Charlottesville

(UPDATE) Interstate 64 — Tree removal operations. Expect right shoulder closures between mile marker 124 and mile marker 142 in the eastbound and westbound lanes, Monday through Friday, 8 a.m. to 4 p.m.

Culpeper County

U.S. 522 (Sperryville Pike) – Other construction. Expect alternating lane closures with flaggers between Virginia Avenue and Aspen Street in the northbound and southbound lanes, daily, 8 a.m. to 4 p.m.

Fauquier County

(NEW) Interstate 66 – Ditch cleaning operations. Expect alternating lane closures between mile marker 15 and mile marker 33 in the eastbound and westbound lanes, Tuesday through Friday, 7 a.m. to 3 p.m.

Interstate 66 – Bridge deck repairs. Expect alternating lane closures between mile marker 29 and mile marker 32 in the westbound lanes, daily, 9 p.m. to 5 a.m.

U.S. 17 (Marsh Road) – Tree trimming operations. Expect right lane closures between Route 651 (Sumerduck Road) and Route 653 (Morgansburg Road) in the northbound and southbound lanes, Monday through Friday, 9 a.m. to 3 p.m.

(NEW) Route 610 (Aquia Road) – Utility work under VDOT permit. Expect lane closures between Route 846 and Route 848 (Tower Hill Road) in the eastbound lanes, daily, 8 a.m. to 3:30 p.m.

Greene County

U.S. 33 (Spotswood Trail) — Road reconstruction. Both shoulders are closed between Route 680 (Pinewood Court) and U.S. 29 (Seminole Trail) in the eastbound and westbound lanes while crews work behind barrels. Traffic is diverted onto the newly constructed eastbound lanes while crews reconstruct the westbound lanes. Drivers should use caution through the work zone and stay alert for construction vehicles entering and exiting the roadway daily. Expected completion is summer 2023.

Route 645 (Moore Road) – Drainage installation. Expect road closures at U.S. 33 (Spotswood Trail) in the northbound and southbound lanes, Monday through Friday, 8 a.m. to 3 p.m.

Louisa County

(NEW) Interstate 64 – Shoulder repairs. Expect shoulder closures between mile marker 132 and mile marker 146 in the eastbound and westbound lanes, Tuesday through Friday, 7 a.m. to 3 p.m.

(NEW) U.S. 33 (East Main Street) – Ditch cleaning operations. Expect mobile, alternating lane closures with flaggers, between Route 208 (West Main Street) and U.S. 522 (Cross County Road in the eastbound and westbound lanes, Tuesday through Friday, 7 a.m. to 5 p.m.

(NEW) Route 652 (Kentucky Springs Road) – Bridge deck repairs. Expect lane and shoulder closures at Route 1064 (Randolph Street) in the southbound lanes, Wednesday, 9 a.m. to 4 p.m.

Madison County

(NEW) Route 230 (Orange Road) – Debris pick-up. Expect mobile, alternating lane closures between Route 607 (Elly Road) and Route 691 (Lost Mountain Road) in the eastbound and westbound lanes, Wednesday, 9 a.m. to 1 p.m.

(NEW) Route 230 (Wolftown-Hood Road) – Driveway pipe installation. Expect lane and shoulder closures between Route 661 (Trinity Lane) and Route 662 (Graves Mill Road) in the eastbound lanes, Tuesday, 11 a.m. to 2 p.m.

(UPDATE) Route 231 (South F T Valley Road) – Ditch cleaning operations. Expect mobile, alternating lane closures between Route 670 (Old Blue Ridge Turnpike) and Route 642 (Duet Road) in the northbound and southbound lanes, Thursday, 9 a.m. to 2 p.m.

Rappahannock County

(NEW) U.S. 522 (Zachary Taylor Highway) – Brush removal. Expect alternating lane closures with flaggers, between Route 662 (Little Long Mountain Road) and Route 610 (Chester Gap Road) in the northbound and southbound lanes, Tuesday and Wednesday, 8 a.m. to 3 p.m.

Road conditions and other real-time travel information can be found on the 511 Virginia website, the free VDOT 511 mobile app or by calling 511 from any phone in Virginia. VDOT updates are also on Facebook and the district’s Twitter account, @VaDOTCulp.

STAUNTON DISTRICT TRAFFIC ALERT FOR FEBRUARY 20 – 24, 2023

Highway Work Zones in the VDOT Staunton District

STAUNTON – The following is a list of highway work that may affect traffic in the Staunton transportation district during the coming weeks. The Staunton District consists of 11 counties from the Alleghany Highlands to the northern Shenandoah Valley: Alleghany, Bath, Rockbridge, Highland, Augusta, Rockingham, Page, Shenandoah, Frederick, Clarke and Warren.

Scheduled work is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.

*NEW* or *UPDATE* indicates a new or revised entry since last week’s report.

ALLEGHANY COUNTY

INTERSTATE 64

*UPDATE* Mile marker 7 to 16, eastbound – Single lane or shoulder closures for cable rail and drainage maintenance, Monday through Friday from 7 a.m. to 5:30 p.m.

Mile marker 7 to 10, eastbound – Single lane closures for maintenance to various bridges, 7 a.m. to 7 p.m. through Friday.

Mile marker 13 to 17, eastbound and westbound – Alternating lane closures for maintenance to bridge over Jackson River, 6 a.m. to 6 p.m. through April 30.

PRIMARY ROADS

Various roads – Flagger traffic control for tree and debris removal, drainage work, pothole patching, brush cutting and shoulder repairs. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS

Various roads – Flagger traffic control for ditch work, pipe replacement and brush cutting. Mobile traffic control for mowing. Weekdays from 7:30 a.m. to 3 p.m.

BATH COUNTY

PRIMARY ROADS

Various roads – Flagger traffic control for shoulder repairs and pipe cleaning. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS

Various roads – Flagger traffic control for brush cutting and pipe cleaning. Weekdays from 7:30 a.m. to 3 p.m.

ROCKBRIDGE COUNTY

INTERSTATE 64

No lane closures reported.

INTERSTATE 81

*NEW* Mile marker 175 to 177, northbound and southbound – Overnight single lane closures for inspection of Route 11 overpass bridge, Monday night from 8 p.m. to 7 a.m.

*NEW* Mile marker 180 to 205, northbound – Right shoulder closures for guardrail and drainage maintenance, Monday through Thursday from 7 a.m. to 4:30 p.m.

*NEW* Mile marker 198 to 195, southbound – Right shoulder closures for sign work including along Exit 195 off-ramp, Monday through Friday from 8 a.m. to 5 p.m.

PRIMARY ROADS

Route 42 (Virginia Avenue) – Flagger traffic control between Goshen town line and Route 39 (Maury River Road) for maintenance to bridge over Calfpasture River, 7 a.m. to 5 p.m. through March 3.

Various roads – Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting. Mobile lane closures for mowing. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS

Various roads – Flagger traffic control for grading, pipe replacement, ditch work, tree removal, pavement patching, shoulder repairs and brush cutting. Mobile lane closures for mowing. Weekdays from 7:30 a.m. to 3 p.m.

HIGHLAND COUNTY

PRIMARY ROADS

Various roads – Flagger traffic control for pothole patching, brush cutting and shoulder repairs. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS

Various roads – Flagger traffic control for brush cutting, pipe cleaning, tree removal, adding stone to unpaved roads and ditch work. Weekdays from 7:30 a.m. to 3 p.m.

AUGUSTA COUNTY

INTERSTATE 64

*NEW* Mile marker 89 to 87, westbound – Overnight mobile lane closures for sign inspections, Sunday and Monday nights (February 19-20) from 8 p.m. to 5 a.m.

INTERSTATE 81

*NEW* Mile marker 219 to 224, northbound and southbound – Overnight mobile lane closures for sign inspections, Sunday through Tuesday nights (February 19-21) from 8 p.m. to 5 a.m.

PRIMARY ROADS

*NEW* Route 11 (Lee Highway) – Right-turn lane and shoulder closures near intersection with Route 616 (Dam Town Road/Fort Defiance Road) for soil boring operations, Monday through Friday from 9 a.m. to 2 p.m.

SECONDARY ROADS

Route 601 (Estaline Valley Road) – Flagger traffic control between Route 811 (Augusta Springs Road) and Route 603 (Pond Gap Lane) for maintenance to bridge over Little Calfpasture River, 6 a.m. to 6 p.m. through May 31.

*NEW* Route 703 (Hewitt Road) – Flagger traffic control near Edison Creek Road for railway bridge inspection, Friday from 8 a.m. to 5 p.m.

Route 795 (Saint James Road) – Flagger traffic control between Route 254 (Hermitage Road) and Route 807 (Farm Draft Lane) for maintenance to bridge over Christians Creek, 7 a.m. to 6 p.m. through March 13.

Various roads – Mobile traffic control for mowing operations. Flagger traffic control for drainage work, tree removal, shoulder repairs, pavement patching and brush cutting. Weekdays from 7:30 a.m. to 3 p.m.

ROCKINGHAM COUNTY

INTERSTATE 81

Mile marker 240 to 257, northbound and southbound – Overnight northbound or southbound slow-roll traffic control for removal of Route 720 overpass bridge, 11 p.m. to 5 a.m. through night of March 30. During slow-roll operations, be alert for temporary on-ramp closures at exits 240, 243, 245, 247, 251 and 257. Northbound exit 247 on-ramp closed from 11 p.m. to 5 a.m. Detour posted. Northbound and southbound overnight lane closures for bridge demolition work, 8 p.m. to 7 a.m. through night of March 30. Work is related to Route 720 overpass bridge replacement.

PRIMARY ROADS

Route 33 (East Market Street, Harrisonburg) – Eastbound and westbound alternating lane closures between Burgess Road and MLK Jr. Way for shoulder widening, drainage work and barrier installation, Monday to Friday from 8 a.m. to 3 p.m. Be alert for travel-lane shifts in both directions. Work zone speed limit 25 miles an hour. Traffic restrictions are for Route 33 bridge replacements and interchange improvementproject.

Route 33 (Rawley Pike) – Flagger traffic control between Route 847 (Rawley Springs Road) and West Virginia line for shoulder repairs, ditch and pipe work, brush and tree cutting. Weekdays from 7:30 a.m. to 4 p.m. through May 1.

Route 259 (West Lee Street, Broadway) – Traffic uses temporary bridge between Route 42 (Main Street) and Route 1411 (Shenandoah Avenue). Work Zone speed limit 25 miles an hour. Traffic restrictions are for Linville Creek bridge replacement.Estimated project completion November 2023.

Various roads – Mobile traffic control for mowing operations. Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS

Route 720 (Smithland Road/Old Furnace Road) – Closed between Route 718 (Old Furnace Road) and Route F-238 (Buffalo Drive) for replacement of Route 720 bridgewith estimated completion in fall 2023. Follow posted detour.

Route 895 (Fieldale Place) – Closed to through traffic between Harrisonburg city limits and Route 710 (Reservoir Street) for sewer line replacement with estimated completion of March 24. Follow posted detour.

PAGE COUNTY

PRIMARY ROADS

Various roads – Mobile traffic control for mowing operations. Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting. Weekdays from 7:30 a.m. to 3 p.m.

SECONDARY ROADS

*NEW* Route 622 (Judy Lane Extension) – Shoulder closures between Route 623 (Judy Lane) and Route 624 (Pine Grove Road) for utility pole replacements, February 20 – March 3 from 9:30 a.m. to 2:30 p.m.

*NEW* Route 689 (Chapel Road) – Shoulder closures near intersection with Route 679 (Hill Top Circle) for utility pole replacements, February 20 – March 3 from 9:30 a.m. to 2:30 p.m.

Various roads – Flagger traffic control for brush cutting and pipe cleaning. Weekdays from 7:30 a.m. to 3 p.m.

SHENANDOAH COUNTY

INTERSTATE 81

*NEW* Mile marker 297 to 298, northbound and southbound – Shoulder closures for inspection of bridges over railway, Friday from 8 a.m. to p.m.

*NEW* Mile marker 297 to 299, northbound and southbound – Overnight single lane closures for inspection of Route 11 overpass bridge, Monday night from 8 p.m. to 7 a.m.

PRIMARY ROADS

Route 11 (North Massanutten Street, Strasburg) – Flagger traffic control between Thompson Street and Crystal Lane for utility work, 9:30 a.m. to 3 p.m. through Wednesday.

Route 11 (Main Street, Mount Jackson) – Northbound shoulder closures with traffic shifted to center lane for curb and gutter work, southbound lane closures as needed. Work zone is between Route 292 (Conicville Road) and Route 1316 (Avondale Avenue), through July 31.

Route 11 (Old Valley Pike) – Flagger traffic control as needed between Route 720 (Wissler Road) and Mount Jackson town limits, weekdays from 7 a.m. to 5 p.m.  Work zone speed limit 45 miles an hour. Traffic restrictions are for replacement of North Fork Shenandoah River bridge. Estimated completion August 2023.

*NEW* Route 55 (East King Street/Front Royal Road, Strasburg) – Shoulder closures between Route 1975 (Park Road) and Route 11 (Massanutten Street) for utility work, February 20 – March 20 from 7 a.m. to 5 p.m.

*NEW* Route 55 (John Marshall Highway) – Flagger traffic control near intersection with Route 761 (Capon Road) for utility work, February 22 – March 1 from 9:30 a.m. to 2:30 p.m.

Route 55 (John Marshall Highway) – Flagger traffic control near Frederick County line for maintenance to bridge over Cedar Creek, 7 a.m. to 5 p.m. through February 24.

SECONDARY ROADS

*NEW* Route 600 (Zepp Road) – Flagger traffic control near intersection with Route 603 (Van Buren Road) for maintenance to Cedar Creek bridge, February 20 – April 24 from 6 a.m. to 6 p.m.

FREDERICK COUNTY

INTERSTATE 81

*UPDATE* Mile marker 300 to 301, northbound and southbound – Overnight single lane closures for equipment moving and bridge removal work, 8 p.m. to 7 a.m. through night of March 23.

*NEW* Mile marker 317, northbound and southbound – Overnight lane closures for soil and rock testing, February 23 – March 9 from 8 p.m. to 5 a.m.

*NEW* Mile marker 317 to 319, northbound and southbound – Overnight alternating lane closures for survey work, Monday through Thursday nights from 10 p.m. to 5 a.m.

PRIMARY ROADS

*NEW* Route 50/17 (Millwood Avenue) – Overnight northbound and southbound single lane closures for inspection of traffic signals between Route 781 (Custer Avenue/Prince Frederick Drive) and Mall Boulevard, Tuesday night from 8 p.m. to 7 a.m.

Route 55 (Wardensville Pike) – Flagger traffic control near Shenandoah County line for maintenance to bridge over Cedar Creek, 7 a.m. to 5 p.m. through February 24.

*NEW* Route 522 (Front Royal Pike) – Overnight northbound and southbound single lane closures for inspection of traffic signals between Route 50/17 (Millwood Pike) and Route 1376 (Costello Drive), Tuesday night from 8 p.m. to 7 a.m.

Route 522 (Front Royal Pike) – Northbound and southbound right lane closures for utility work between Route 756 (Macedonia Church Road) and Route 1054 (Clydesdale Drive), 9 a.m. to 3:30 p.m. through March 3.

SECONDARY ROADS

*NEW* Route 681 (Chestnut Grove Road) – Flagger traffic control between Route 685 (Light Road) and Route 805 (Myers Lane) for maintenance to bridge over Back Creek, February 20 – April 24 from 7 a.m. to 6 p.m.

Various roads – Alternating lane closures on Route 657 (Senseny Road), Route 736 (Rossum Lane), Route 867 (Twinbrook Circle) and Route 868 (Glenridge Drive) just west of Clarke County line for road improvements and utility work, 9 a.m. to 3:30 p.m. through February 2024.

CLARKE COUNTY

PRIMARY ROADS

No lane closures reported.

SECONDARY ROADS

No lane closures reported.

WARREN COUNTY

INTERSTATE 66

No lane closures reported.

INTERSTATE 81

*UPDATE* Mile marker 299 to 300, northbound and southbound – Overnight single lane closures for equipment moving and bridge removal work, 8 p.m. to 7 a.m. through night of March 23.

PRIMARY ROADS

*NEW* Route 340 (Winchester Road) – Southbound right lane closures near Route 627 (Reliance Road) intersection for road work, Friday from 6 a.m. to 6 p.m.

SECONDARY ROADS

*NEW* Route 624 (Morgan Ford Road) – Flagger traffic control just north of Route 642 (Howellsville Road) for cleaning and debris removal on Shenandoah River bridge, Wednesday from 9 a.m. to 2 p.m.

Vegetation management may take place district wide on various routes. VDOT reminds motorists to use extreme caution when traveling through work zones.

For updated traffic alerts and traveler information, dial 511 or visit 511Virginia.org.

The VDOT Customer Service Center can assist with reporting road hazards, asking transportation questions, or getting information related to Virginia’s roads. Call 800-FOR- ROAD (800-367-7623) or use its mobile friendly website at https://my.vdot.virginia.gov/. Agents are available 24 hours-a-day, seven days a week.

The VDOT Staunton District is on Facebook and Twitter. Follow VDOT statewide accounts on Facebook, Twitter, YouTube, Instagram, LinkedIn and Flickr. RSS feeds are also available for statewide information. The VDOT Web page is located at http://www.VirginiaDOT.org.

LEAVE A REPLY

Please enter your comment!
Please enter your name here