|
|
SCHEDULED CONSTRUCTION AND MAINTENANCE WORK
CULPEPER DISTRICT: March 4-8, 2024
CULPEPER — The following highway work is scheduled, weather permitting, in the Culpeper District during the next week. Traffic movements may be restricted and speed limits reduced in work zones. (NEW) or (UPDATE) indicate revisions since last week’s report.
Culpeper District traffic information is also available on Twitter at @VaDOTCulp and on VDOT’s website at http://www.virginiadot.org/travel/travel_alerts/culpeper/default.asp.
Albemarle County
(UPDATE) Other roadside – Expect mobile work zone with right shoulder closures in the following areas:
- Interstate 64, between mile marker 123 and mile marker 125 in the westbound lanes, Monday, 9 a.m. to noon.
- Interstate 64, between mile marker 118 and mile marker 119 in the westbound lanes, Monday, 11 a.m. to 3 p.m.
New Roadway Construction – Construction of a roundabout at Route 743 (Hydraulic Road) and Hillsdale Drive. Expect lane and shoulder closures with flaggers in the following areas nightly, Monday through Thursday, 9 p.m. to 6 a.m., 10 p.m. Friday to 9 a.m. Saturday, 9 p.m. Saturday to 10 a.m. Sunday, 8 p.m. Sunday to 6 a.m. Monday, through May 5.
- Route 743 (Hydraulic Road), between U.S. 29 (Emmet Street North) and Brandywine Drive, nightly in the northbound and southbound lanes.
- Route 743 (Hydraulic Road), between U.S. 29 (Emmet Street North) and Cedar Hill Road in the northbound and southbound lanes.
Utility work under VDOT permit – Expect lane and shoulder closures in the following areas:
- Route 1403 (Berkmar Drive) at Towncenter Drive, lane closures with directional signs at the roundabout, daily, 7 a.m. to 5 p.m.
- Route 1403 (Meeting Street) at Timberwood Boulevard, lane closures with directional signs at the roundabout, daily, 7 a.m. to 5 p.m.
(NEW) Litter pickup – Expect a mobile work zone with right shoulder closures, Thursday between 118 and mile marker 125 in the following areas:
- Interstate 64, eastbound lanes, 2 p.m. to 3 p.m.
- Interstate 64, westbound lanes, 9 a.m. to 10 a.m.
(NEW) Interstate 64 – Brush removal. Expect a mobile work zone with right shoulder closures between mile marker 124 and mile marker 131 in the eastbound and westbound lanes, Monday through Friday, 8 a.m. to 4 p.m.
(NEW) U.S. 29 (29 Bypass Expressway) – Mobile, alternating lane closures between the ramp to U.S. 29 (29 Bypass Expressway) and Route 654 (Barracks Road) in the northbound and southbound lanes at the ramps only, Wednesday through Friday, 9 a.m. to 2 p.m.
(NEW) U.S. 29 (Monacan Trail) – Super load. Expect slow moving wide load between Route 178 and Route 739 (Boxwood Farm Road) in Amherst County in the southbound lanes, Tuesday, 9 a.m. to 2:30 p.m.
U.S. 250 (Rockfish Gap Turnpike) – Road widening project. Expect lane closures between Birdsall Lane and Route 750 (Old Turnpike Road). The westbound lanes will remain reduced from two lanes to one and the eastbound lane shift will remain in place. This is a long-term closure for the duration of the project. Expected completion date, April 2024.
Route 20 (Scottsville Road) – Bridge superstructure repairs/replacement. Expect temporary traffic signal with new traffic pattern at Route 708 (Red Hill Road). Route 708 is narrowed to one lane for construction on the bridge over the North Fork Hardware River in the southbound lanes. Project completion date, Dec. 2024.
Route 53 (Thomas Jefferson Parkway) – Tree removals. Expect alternating lane closures between Route 729 (Buck Island Road) and Route 732 (Milton Road in the eastbound and westbound lanes, daily through Friday, 7:30 a.m. to 4 p.m.
(NEW) Route 231 (Gordonsville Road) – Other maintenance. Expect alternating lane closures between Route 615 (Lindsay Road) and Route 646 (Lovers Lane) in the northbound and southbound lanes, Tuesday, 9 a.m. to 3 p.m.
Route 641 (Frays Mill Road) – Other bridge work. Road closed at Route 743 (Advance Mills Road) for replacement of bridge over Marsh Run. Drivers on U.S. 29 (Seminole Trail) who need to access Route 743 north and west of the closure should use Route 607 (Cedar Grove Road). Expected completion date, Dec. 5, 2024.
(NEW) Route 708 (Taylors Gap Road) – Resurfacing operations. Expect mobile, alternating lane closures between Route 637 (Dick Woods Road) and Route 708 (Red Hill Road) in the eastbound and westbound lanes, daily, starting Tuesday, 7:30 a.m. to 5:30 p.m.
City of Charlottesville
(UPDATE) Road improvements — Expect lane and shoulder closures with flaggers Monday through Thursday, 9 p.m. to 6 a.m., 10 p.m. Friday to 9 a.m. Saturday, 9 p.m. Saturday to 10 a.m. Sunday, 8 p.m. Sunday to 6 a.m. Monday, nightly through April 19 in the following areas:
- Route 743 (Hydraulic Road), between U.S. 29 (Emmet Street North) and Brandywine Drive in the northbound and southbound lanes.
- U.S. 250 (Bypass Expressway), between U.S. 29 (Emmet Street North) and Dairy Road in the eastbound and westbound lanes.
Culpeper County
(UPDATE) Utility work under VDOT permit – Expect lane and shoulder closures in the following areas:
- U.S. 29 (James Madison Highway) mobile alternating lane closures at Route 663 (Alanthus Road) in the northbound and southbound lanes, daily through Tuesday, 9 a.m. to 3 p.m.
- Route 669 (Carrico Mills Road), occasional shoulder and lane closures between Route 3 (Germanna Highway) and Route 672 (Stones Mill Road) in the northbound and southbound lanes, daily, 9 a.m. to 3 p.m.
- Route 672 (Stones Mill Road), alternating lane closures between Route 669 (Carrico Mills Road) and Route 724 (Youngs Lane) in the eastbound and westbound lanes, daily, 9 a.m. to 3 p.m.
Route 229 (Rixeyville Road) – Road widening project. Expect alternating lane closures between U.S. 211 (Lee Highway) and Route 694 (Ira Hoffman Lane) in the northbound and southbound lanes, daily, 7:30 a.m. to 5:30 p.m.
Fauquier County
(UPDATE) Utility work under VDOT permit – Expect lane and shoulder closures in the following: areas:
- Route 55 (John Marshall Highway), mobile alternating lane closures between Route 622 (Whiting Road) and Route 709 (Belvoir Road) in the eastbound and westbound lanes, daily, 9 a.m. to 3 p.m.
- Route 690 (Bear Wallow Road), alternating lane closures between Filly Lane and the Warrenton Town line in the northbound and southbound lanes, daily, 9 a.m. to 3 p.m.
(NEW) Interstate 66 – Sign installation. Expect mobile, alternating lane closures between mile marker 17 and mile marker 34 in the eastbound and westbound lanes, Monday through Friday, 7 a.m. to 3:30 p.m.
Route 672 (Blackwell Road) – Pipe repairs/installation. Road closed between Route 1460 (Ivy Hill Drive) and Route 605 (Arlie Road) in the southbound lanes, daily, through Friday.
Greene County
(NEW) U.S. 29 (Seminole Trail – Utility work under VDOT permit. Expect right land and right shoulder closures between U.S. 33 (Spotswood Trail) and Route 607 Cedar Grove Road in the southbound lanes, Tuesday and Wednesday, 10 a.m. to 2 p.m.
Louisa County
Construction of a new roundabout – Expect alternating lane closures daily, 7 a.m. to 6 p.m. in the following areas. Project anticipated completion date, Jan. 31, 2025.
- U.S. 522 (Zachary Taylor Highway) between Route 623 (Chopping Road) 0.3 miles north of Route 208 (New Bridge Road) in the northbound and southbound lanes.
- Route 208 (New Bridge Road) between U.S. 522 (Zachary Taylor Highway) and Alma Gaynelle Drive in the eastbound and westbound lanes.
(UPDATE) Utility work under VDOT permit – Expect lane and shoulder closures in the following areas:
- Route 652 (Kentucky Springs Road), alternating lane closures between Route 208 (New Bridge Road) and Route 1035 (Pine Point Place) in the northbound lanes, daily, 9 a.m. to 3 p.m.
- Route 652 (Kentucky Springs Road), left shoulder closures between Route 1035 (Pine Point Place) and Route 700 (Haley Drive) in the northbound lanes, daily through Thursday, 8 a.m. to 4:30 p.m.
- Route 700 (Johnson Road), right shoulder closure between Route 652 (Kentucky Springs Road) and dead end of Route 700 (Haley Drive) in the northbound lanes, daily through Thursday, 8 a.m. to 5 p.m.
(NEW) Interstate 64 – Brush removal. Expect mobile work zone with right shoulder closures between mile marker 131 and mile marker 147 in the eastbound and westbound lanes, Monday through Friday, 8 a.m. to 4 p.m.
Route 661 (Crewsville Road) – Pipe repairs/installation. Road closed between Route 601 (Paynes Mill Road) and Route 602 (Copper Line Road), daily, through April, 15, 2024.
Madison County
(NEW) U.S. 29 (South Seminole Trail) – Shoulder repairs. Expect mobile, alternating lane closures between the Greene County line and the Culpeper County line in the northbound and southbound lanes, Monday through Thursday, 8 a.m. to 2 p.m.
U.S. 29 (South Seminole Trail) – Bridge repairs. Expect alternating lane closures between Route 621 (Seville Road) and Route 609 (Fredericksburg Road) in the southbound lanes, daily, 7 a.m. to 5 p.m.
Rappahannock County
Route 729 (Richmond Road) – Bridge approach repairs. Expect flagging operation at Route 676 (Gore Road) in the northbound lanes, daily, 7 a.m. to 5 p.m.
Road conditions and other real-time travel information can be found on the 511 Virginia website,
the free VDOT 511 mobile app or by calling 511 from any phone in Virginia. VDOT updates are also on the Culpeper District Facebook page and the district’s Twitter account,@VaDOTCulp.
(END)
VDOT’s nine-county Culpeper District includes the counties of Albemarle, Culpeper, Fauquier, Fluvanna, Greene, Louisa, Madison, Orange and Rappahannock. The independent city of Charlottesville maintains its own roads.
LYNCHBURG DISTRICT
TRAFFIC ALERT
March 4-10, 2024
LYNCHBURG, Va. – Highway work requiring road/lane/structure closures is planned;
however, work may be delayed/canceled due to weather or other issues. Items in
italics contain new/updated information. For up-to-date information, call 511 or visit
www.511Virginia.org.
District-wide activities:
Crews will perform various activities throughout the district to include, but are not limited to
bridge & guardrail maintenance, brush/tree/limb cutting, pothole/surface/shoulder work,
surface treatment/paving operations, work orders, mowing, boom axing, drainage repairs/
work and roadside cleanup.
Work at specific locations:
Amherst County:
Route 29 & Route 151 (Patrick Henry Hwy.) – Construction of a Restricted Crossing U-
Turn, storm drainage, advanced warning flashers, traffic lighting. Use caution and watch
for changes in the traffic pattern during construction. Estimated completion November
2024.
Please note district-wide activities above.
Appomattox County:
Route 131 (Old Courthouse Rd.) from Route 460 BUS (Confederate Blvd.) Bypass
(Richmond Highway) – Route 131 Reconstruction. Traffic shift in place. Lane closures
expected. Use caution. Estimated completion January, 2025.
Please note district-wide activities above.
Bedford County:
Please note district-wide activities above.
Buckingham County:
Please note district-wide activities above.Charlotte County:
Route 15 (Farmville Highway) at Route 15/360 BUS (Four Locust Highway) – Roundabout
project. Change in traffic pattern now in place allowing two-way movement along Route
15/360 BUS (Four Locust Highway) and a stop condition for Rte. 15 (Farmville Highway)
southbound traffic. The on-ramps from Route 15 to the Route 15/360 (Kings Highway)
and the off-ramp from Route 15/360 (Kings Highway) to Route 15 are closed to traffic.
Message boards and detour signage will alert motorists to the change and direct traffic
along the detour. Estimated overall project completion October 2024.
Route 701 (Thorntons Mill Road) – Debris removal. Route 701 (Thorntons Mill Road) is
closed from Route 691 (Tower Road) to Route 615 (Rolling Hill Road) due to debris
removal. A detour with signs is in place. Estimated completion March 22, 2024.
Please note district-wide activities above.
Cumberland County:
Route 45 (Cartersville Rd.) at Route 690 (Columbia Rd.) – Roundabout Project. Speed
limit will be reduced to 35 mph through the work zone. Shoulder and lane closures
expected. Use caution. Estimated completion November 2024.
Please note district-wide activities above.
Halifax County:
Route 501 (L P Bailey Memorial Highway) at Route 628 (Chestnut Road) – Intersection
improvement project. Shoulder and lane closures expected. Use caution. Estimated
completion December 2024.
Route 610 (Crystal Hill Rd.) – Bridge Replacement. Route 610 (Crystal Hill Road) is
closed to through traffic from Route 641 (Lower Liberty Rd.) to Route 626 (Howard P.
Anderson Road). Estimated completion March 22, 2024.
Please note district-wide activities above.
Lynchburg:
Please note district-wide activities above.
Nelson County:
Route 29, between Route 6 (River Rd.) and Route 718 (Mountain Cove Rd.) – Shoulder
widening, rumble strip installation, guardrail installation. Work to begin March 4 and cause
alternating lane closures. Estimated completion January 2025.
Route 674 (Jenny’s Creek Rd.) – Emergency road repairs. Motorists should expect delays
on Route 674 (Jenny’s Creek Rd.) in Nelson County due to emergency road repairs. A
culvert underneath the roadway has collapsed. Expected completion March 6, 2024. A
detour is in place, utilizing Route 56 (Tye Brook Hwy.) and Route 151.
Route 60 (Richmond Highway) over James River – Bridge deck replacement. Lane
closures and changes in traffic patterns in effect. Traffic is utilizing the other side of the
bridge to cross. Est. comp. end of July 2024.
Please note district-wide activities above.
Pittsylvania County:
Please note district-wide activities above.Prince Edward County:
Route 665 (Worsham Road) – Bridge Replacement. Route 665 (Worsham Road) is closed
to through traffic from Route 15 (Farmville Road) to the intersection of Route 630 (Redd
Shop Road). A detour with signs is in effect, using Route 15 to Route 628 (Granite Falls
Blvd.) to Route 630 (Oak Ridge Road) back to Route 665. Estimated completion May 17.
Please note district-wide activities above.